• For you to be able to enter amounts in this tab, it is necessary to unlock the plan by pressing the Unlock Plan icon.
  • This will disable the ‘Outline Budget Planner’ on the Workstage’s tab. Once you have
    unlocked the plan, information can only be entered via the detailed plan pages.
  • The Expenses Plan is used to project the level of expenses we expect to incur over the duration of the project. This can be updated in two ways:
    • % allowance based on labour budget plan (cost) % which will then automatically populate the monthly cells based on what has been projected in the Labour Plan (line 1 below)
    • Manual Entry – Enter the details of each projected expense with description and selection of Recoverable/Non-Recoverable Option (line 2 and 3 below).